Main | Locomotive No. 01 »

A new 009 layout

In October 2004 I visited the EXPONG exhibition in Swanley held by the Greenwich and District Narrow Gauge Railway Society (GDNGRS). The show is purely for narrow gauge model railways of all gauges and there were some excellent layouts there, many I had not seen before. Tucked away in a separate room down the corridor from the main exhibition was the entries for a challenge that the GDNGRS has set. This was the shoe box Challenge where an operating layout had to fit inside of a shoe/boot box and very creative the entries were as well.

As I do not have enough space at home to build a full layout this seemed like an excellent challenge for 2005 so as soon as I got home I started to plot in my head what I would like to do. Several months later the GDNGRS released a statement that the 2005 competition would be slightly different. It is called the Cubic Challenge and the layout must fit into a 500mm cubic space. That's not very big but bigger than most shoe boxes!

In March 2005 I started in earnest to build a new 009 gauge entry for the Cubic Challenge Competition and I am diarising the progress here.

Comments

Oh at last I am doing some railway modelling! Years of talk now to walk the walk!

really good and atmospheric work. Bravo
John

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)